ContourGlobal develops, owns and operates power infrastructure that enables faster deployment of data centers through dedicated power and powered-land solutions. As a KKR-backed independent power producer (IPP), the company delivers reliable, scalable and cost-competitive energy through co-located generation, powered land and tailored power supply arrangements. As electrification becomes a pillar of energy security, industrial competitiveness and technology leadership, our energy expertise and ready-to-build projects help close the gap between AI’s power demand and the grid’s ability to serve it.

560
560
TWh
Estimated global data center electricity consumption in 2026
195
195
GW
Projected global data center installed capacity by 2030
15
15
GW+
ContourGlobal pipeline of fast-to-deploy projects

A new energy equation: the AI–Power Nexus

Artificial intelligence is redrawing the global energy map. Data center electricity consumption grew more than 50% in just three years (+161 TWh), reaching an estimated 485 TWh in 2025 and set to exceed 560 TWh in 2026.

While overall global electricity demand rose +3% in 2025, data center demand surged +17% year-on-year, and in the U.S. alone +23%, making it the single strongest driver of domestic electricity growth.

Even as systems become more efficient, the sheer scale of AI adoption keeps pushing power needs upward. Global data center installed capacity is projected to grow from today’s levels to around 195 GW by 2030.

Furthermore, the data center landscape is not only expanding – it is diversifying. Facilities now range from 5–10 MW to new 300–500 MW AI factories, and next-generation 1–5 GW megacampuses. With inference expected to reach roughly two-thirds of AI power consumption in 2026, flexibility of supply becomes as critical as capacity itself. At the same time, developers face constrained grids, curtailed capacity and rising public scrutiny.

ContourGlobal is an experienced independent power producer able to become a strategic partner to Data centers that need timely, reliable and affordable energy solutions and an with ready-to-go opportunities.

Powered Land for Data Centers

ContourGlobal aims to address one of the key constraints to data center growth: access to reliable, scalable and timely power.

Combining a diversified generation fleet with a 15+ GW development pipeline across key growth markets, ContourGlobal brings together expertise in renewables, storage and thermal generation to deliver scalable and flexible energy solutions tailored to data center requirements.

Are you looking for a reliable energy solution?

 

ContourGlobal in actively scouting for project development to data center developers & colocators, hyperscalers, AI operators to deliver dedicated, time-matched power across the U.S., Chile and Europe.

Let’s discuss how our ready-to-build pipeline can meet your capacity, speed and reliability needs.

    * required fields

    Read our CEO’s interviews on building a power-ready platform for data centers
    ContourGlobal CEO confirms 800 MW UK pipeline after 2 GWh BESS deal - Energy Storage

    June 29th, 2026 – Speaking to ESS News by PV Magazine on the sidelines of Intersolar in Munich, ContourGlobal CEO Antonio Cammisecra provided further detail on the company’s UK strategy following its entry into the market through the acquisition of the Wallace battery storage project in Scotland. He revealed that ContourGlobal’s development pipeline across the UK for solar, storage and wind projects already stands at 800 MW, describing the country’s “sophisticated market” as one that could become the company’s second or third largest globally. Cammisecra noted that he has advocated for a stronger UK focus since taking the helm of the KKR-backed business two years ago, and confirmed that a dedicated local team has been established, alongside close relationships with local developers. He placed the Wallace project within ContourGlobal’s broader international storage strategy, drawing a parallel with the company’s hybrid solar-and-storage assets in Chile (200 MW/1.3 GWh, already commissioned) and Arizona (360 MW/1.4 GWh, soon to enter construction), and pointed to the UK’s Balancing Mechanism as a key revenue driver for the Wallace site going forward.

    PV MAGAZINE - ContourGlobal: Bills Decree risks penalizing batteries, especially on the Capacity Marketside

    March 9th, 2026 – In an interview with pv magazine Italia, ContourGlobal’s CEO Antonio Cammisecra shared the company’s perspective on Italy’s Bills Decree, highlighting both its short-term intent and its structural limitations. He noted that while the decree addresses immediate issues such as ETS costs and price formation, it does not tackle the underlying drivers of high energy prices, namely the country’s reliance on fossil fuels and exposure to volatile gas markets. Cammisecra emphasized that accelerating the deployment of renewable energy and battery storage systems remains the most effective and sustainable way to reduce costs and strengthen energy independence. He also warned that certain provisions risk undermining investor confidence and slowing down new capacity development, particularly in the storage segment, where the current Capacity Market design could disadvantage batteries compared to gas-fired generation. The CEO further underlined the importance of enabling long-term planning for renewable and storage auctions, as well as promoting market-based instruments such as PPAs, especially for SMEs, to ensure price stability and project bankability. More broadly, Cammisecra reaffirmed the need for a stable and coherent regulatory framework capable of unlocking private investment and supporting a faster, more resilient energy transition in Italy.

    CLEANING UP PODCAST - Renewables Are Here To Stay. Get Over It.

    June 4th, 2025 – In Cleaning Up, a podcast hosted by Michael Liebreich — founder of Bloomberg New Energy Finance — Antonio Cammisecra shared ContourGlobal’s strategic evolution.
    He spoke about the company’s coal exit (e.g. Sochagota plant divestment in Colombia), the transformation of Bulgarian assets with solar and battery storage, and investment in hydrogen technologies.
    Cammisecra defended renewables against criticism following blackouts, arguing that grid reliability hinges on regulation and system architecture.
    He raised concerns about AI-driven electricity demand, advocating for a smarter, more decentralized grid.
    Antonio joined Michael to explore how to build resilience and security in renewable-heavy grids, how ContourGlobal’s battery systems deliver solar at night, and why grids worldwide are struggling under growing demand.

    Discover our new project
    Project Sterling is a large-scale hybrid project combining 509 MWp/ 450 MWac of solar PV with 360 MW / 1.4 GWh of battery energy storage capacity (4 hours duration). Once operational, it will be ContourGlobal’s largest renewable asset to date.
    Discover our projects
    Black Hollow Sun Complex in Colorado is made of phase I, a 185 MWp solar plant, already in operation and Phase II, 139 MWp, which construction continues at a strong pace.
    Discover our projects
    In Chile, we are pioneering hybrid models that combine 452 MWp of solar PV and 400 MW of BESS, with 2.5 GWh of storage capacity, enabling continuous energy delivery for up to 6.5 hours after sunset under the innovative “Sun at Night” model and PPA.
    FAQ
    What is ContourGlobal's value proposition for data centers?

    ContourGlobal is a KKR-backed independent power producer (IPP) that helps data center developers accelerate time-to-market through co-located generation, powered-land solutions and profiled PPAs. It pairs 6.2 GW of installed and under-construction capacity across 125 assets with a 15 GW+ pipeline of renewables and BESS.

    What does "Data Center Ready" mean for ContourGlobal?

    It means integrating data center hosting capability directly into power generation asset development — offering powered land near generation assets and profiled PPAs, so developers get reliable power certainty and faster grid connection.

    Can ContourGlobal be a "bring your own power" partner for hyperscalers?

    Yes. ContourGlobal offers co-located and generation potentially also in Behind the Meter configuration that lets data center and AI operators secure dedicated, time-matched power, reducing exposure to grid constraints and interconnection queues.

    What technologies does ContourGlobal use to power data centers?

    A combination of solar PV, battery energy storage (BESS), wind and, potentially, flexible natural gas. RES + BESS provide fast, cost-competitive power and demand flexibility, while existing gas capacity offers reliable backup and might act as instrument to flexibly enrich / structure power supply to data centers and flexible natural gas.

    Does ContourGlobal have assets in the US?

    ContourGlobal is strategically positioned in today’s tier-1 U.S. data center markets — Arizona, Virginia and Texas — with co-located generation and profiled PPAs tailored to developers’ needs.

    Where can ContourGlobal support data center growth outside the U.S.?

    ContourGlobal can support data centers in fast-growing hubs hubs across Chile, Europe (e.g., Italy, Spain, Greece, Austria, Bulgaria, …)” and the UK, matching its multi-technology, multi-geography footprint to data center growth corridors.

    Has ContourGlobal already built power projects for industrial customers?

    Yes. Its flagship Sterling project is a 509 MWp solar + 1.4 GWh BESS facility tailor-made for Tesla, demonstrating ContourGlobal’s ability to design large-scale, customer-specific power solutions.

    What is ContourGlobal's recent construction track record?

    In 2025 alone, ContourGlobal constructed 1,250 MW and started construction on a further 1,320 MW, backed by 20 years of operational excellence across thermal, hydro, solar and BESS assets.