Places where we work

Explore our plants and learn more about the technology we are using to make the future bright.

Contact us

We are present in 19 countries all over the world

Chapada Complex

ContourGlobal owns interests in Chapada I, II and III, its three wind projects in the Brazilian state of Piauí totalling 438 MW of gross capacity.

Renewable
Wind
Brazil
438 MW
  • ContourGlobal Parque
    Chapada
  • ContourGlobal Parque 2
    Chapada
  • ContourGlobal
    Chapada II

Chapada I

  • 205 MW

    installed capacity

  • Since 2015

    in operation

With 205MW installed capacity, Chapada I is able to supply energy for 500,000 homes, creating an estimated 700 direct jobs and 2000 indirect jobs during its construction

The project was awarded with a 20 years’ term PPA in the Brazilian energy auction held in August 2013. Contour Global is setting the pace to meet the commitments established under the auction rules, most importantly COD in September 2015, being already the first company of those awarded to mobilize construction.

The complex consists of 7 adjacent wind farms, with a mix of GE technologies GE1.85MW and GE1.7MW. The investment is a partnership between Casa dos Ventos, a Brazilian wind project developer, and Chesf, a generation and transmission company owned by Eletrobras.

Chapada II

  • 173 MW

    installed capacity

  • Since 2016

    in operation

Chapada II Wind Complex was the second successful wind deal executed in Brazil by Contour Global in 2013, being awarded with a 20 years' term PPA for 173 MW in the Brazilian energy auction held in November 2013. The project is located in the south of Piaui State just aside of Contour Global’s Chapada I Wind Complex, awarded in August of the same year. Therefore, the projects benefited from high synergies during construction and operations, which helped the project to achieve COD in early 2016.

Chapada II Wind Complex consists of six adjacent wind farms, with a mix of GE technologies GE1.85MW and GE1.7MW. This is the second successful project in partnership with Casa dos Ventos, a Brazilian wind developer, and Chesf, a generation and transmission company owned by Eletrobras.

Chapada III

  • 60 MW

    installed capacity

  • Since 2016

    in operation

Chapada III Wind Complex was the third successful wind deal executed in Brazil by ContourGlobal in 2014, being awarded in the same Brazilian energy auction of Chapada II, held in November 2013, with 20 years’ term PPA for 60 MW. The Complex, comprised of two adjacent wind farms (Ventos de Santo Augusto III and Ventos de Santo Augusto V, with 29.6 MW of installed capacity for each one). The Complex is located in the South of Piaui State, in the board of Plateau, one of the windiest regions of Chapada do Araripe. As of Chapada II, the projects benefited from high synergies during the construction and operations.

Santo Augusto III and V are comprised of 32 wind turbines of GE technologies GE 1.85MW, selected specially to optimize its annual energy production.

 

  • Chapada Complex Teaser
  • ContourGlobal Chapada II Complex
    Chapada II

How we work with our neighbors in South of Piaui, Brazil:

  • Hosting practical activities such as ecological hikes to visit archaeological sites
  • Organizing environmental photograph contests for youngsters
  • Performing environmental awareness and pedagogical training campaigns to more than 400 local school students about biodiversity and its sensitive aspects
  • Chapada - Social Projects 1
  • Chapada - Social Projects 2
  • Chapada - Social Projects 3
  • Chapada - Social Projects 4